Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 13, 2023

October 13, 2023

No Information to Display

1 N Jefferson Ave

Site Work

No Information to Display

$72,000.00

Public - County

img_map_placeholder

1 N Jefferson Ave, Canonsburg, PA

Subscribe to View Full Documents

All work shall be conducted in accordance with the Scheduling Requirements of the Work as hereafter specified. The Contractors shall be responsible for the means, methods and sequences to implement the specified schedule. 1. The Contractor shall be responsible for submitting a Project Schedule, as specified in Section 007216 "General Conditions" Article 3. 2. Note: Construction schedules representing anything less than a five day work week shall not be permitted, see also Section 007216 "General Conditions" Article 3, Paragraph 3.10. B. The site is limited in size. Visitors and school occupants/personnel shall have use of the existing parking areas and drives. Construction traffic and deliveries shall be restricted on-site between certain hours so as not to interfere with the school arrival/dismissal schedules. Site access for construction equipment/activities shall be coordinated with the School District. Construction equipment, trailer, vehicles and material storage, if required, shall be located as directed by the Architect and Owner at the initial Job Conference. Contractor shall be restricted to this area. Only one (1) trailer will be permitted for the Contractor, if needed, and shall be located in the area designated above. All other parking and material storage, which cannot take place within the area(s) designated above, shall take place off site. Failure of the Contractor to police his workmen's parking and material storage requirements shall result in withheld payments and/or fines. 1. Contractor shall repair/restore any area used for staging, storage, parking, etc., as well as any areas damaged by construction activities, to original or better condition at completion of work. C. Scheduling of all work shall be coordinated with the Owner, as well as access routes to work areas. 1. Work requiring any shut-offs / shut-downs of heating, plumbing and/or electrical services shall be scheduled with the Owner. Advance notice must be given to the Architect and the School District when any shut-offs or shut-downs are scheduled Such Bid Bond or Check shall be submitted with the understanding that it shall guarantee that the Bidder's Bid will not be withdrawn for a period of at least sixty (60) days after the scheduled closing time for receipt of bids; that if the Bid is accepted, the Bidder will execute the Form of Agreement, as provided by the Owner, with all blanks appropriately filled and will submit the required 100% Performance and Labor and Material Bonds (submitted on A.I.A. Document A312) and 100% Maintenance Bond as specified in Section 007216, Article 11; and that in the event of withdrawal of said Bid within said period, or the failure to enter into said Agreement and submit said Bonds within ten days after the Bidder has received notice of the acceptance of the Bid, the Bidder shall be liable to the above mentioned Owner for the full amount of such Bond or Check as representing the damage to the Owner on account of the default of the Bidder in any particular hereof The Owner reserves the right to accept or decline the Contractor's Withdrawal of Bid Request and reserves the right to retain the bid bond.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects