Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

March 15, 2024

August 15, 2024

1952 Bay St

Renovation

No Information to Display

$800,000.00

Public - State/Provincial

img_map_placeholder

1952 Bay St, Victoria, BC

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

This project's premise is to renovate an existing portion of the nuclear medicine department to accommodate a new Spect CT camera/scanner. The project will take place in the "West Block" of the Royal Jubilee hospital which is an older section with thick concrete partitions. The concrete partitions were installed to provide protection against radiation from the medical imaging equipment and nuclear radiation from injections. There will likely be some structural concerns that will arise from the removal and modification of these walls. Lead shielding sheets will be used for radiation protection in the new space. The new piece of equipment is yet to be selected however it will likely require some ambient cooling of the space due to the heat output it generates. In addition a new electrical service will need to be provided to the room, likely from the main distribution across the campus. Upgrades to the finishes of the space (ceilings and flooring) will be required. Coordination of delivery and installation with the equipment vendor will be the construction manager's responsibility. Question Deadline: Mon Sep 11, 2023 2:00:00 PM (PDT) Construction Starts March 15 2024 Construction Complete August 15 2024 The method of Contractor Selection has not been Determined at this time.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.