Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 6, 2023

November 2, 2023

July 10, 2024

8201 Palm Ave

New Construction

No Information to Display

$1,500,000.00

Public - City

img_map_placeholder

8201 Palm Ave, Lamont, CA

Subscribe to View Full Documents

COMPLETION OF WORK: 1. The work of this bid package must be complete according to the construction schedule included with contract documents. 2. The construction schedule prepared by the Construction Manager (CM) and/or other target dates pertaining to this bid package must be adhered to by the Prime Contractor or liquidated damage will be assessed by OWNER in the amount listed in the Agreement. No extension of time will be granted unless the circumstances are within the stipulations of the General Conditions. 3. Procurement of materials and/or equipment shall be done in a timely manner to comply with the project schedule. Materials and/or equipment properly stored, in accordance with the Owner's requirements, will be paid for as noted in the Contract Documents. 4. Clean-up related to work performed under this section. Clean-up of one area before moving to another area to perform work. 5. Provide submittals as required by contract documents to include product data, shop drawings, samples, and/or color charts as applicable. 6. The term "provide" means to "furnish and install, complete and ready for the intended use." 7. The work includes, but is not necessarily limited to, the items numerically listed below and in accordance with the applicable Drawings and Specifications section(s). Provide all work specified within this Bid Package and DESCRIPTION: Drawings and general provisions of Contract, including General and Supplementary Conditions, Division - 00 Bidding and Contract Requirements and Division 01 General Requirements apply to the work of this Bid Package. The work under this Bid Package shall include the furnishing and installing of all material, equipment, procedures, methods, items, and labor as required to complete the work described in this Bid Package. The work shall be completed as shown on the Drawings and specified in any applicable specification sections.

5 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects