Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 29, 2023

September 18, 2023

December 22, 2023

Lakelse Ave

Renovation, Site Work

No Information to Display

$100,000.00

Public - City

img_map_placeholder

Lakelse Ave, Terrace, BC

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

The City of Terrace Lakelse Avenue Canopy Removal (“the Project”) is the removal of the canopy structure attached to 15 buildings along the north and south sides of Lakelse Avenue between Emerson St. and Kalum St. The Project also includes any repairs to the facades of buildings after the canopy removal. The selected Proponent will be required to remove the existing canopy structure from the north and south sides of Lakelse Avenue between Emerson St. and Kalum St. The canopy measures approximately 240m long, is selfsupported by posts mounted into the pedestrian walkway, and is affixed to the facades of the buildings adjacent to it. It is the selected Proponents responsibility to ensure Business operating hours are not impacted by construction. This project will be competed in two phases; the first being the removal of the existing canopy and inspection of the building facades, the second is the repair of building facades. Phase 1 is to include: Removal of the existing canopy structure while ensuring no disruption to business operating hours. Disposal of all demolition debris. Termination of electrical cables from canopy. Inspection of buildings for repair with a City Representative. Temporary weather proofing or covering of areas to be repaired until a repair change order is issued as needed. Repair of all concrete and interlock stone walkways. Restoration of all properties affected by construction works. Phase 2 is to include: Design of façade repairs if required. Repair of all building facades as agreed by the City. Re-Installation of business signage. In addition, the City would like the Proponents to provide the value-add pricing to install a junction box onto the building exteriors where the electrical needs to be terminated in order to allow for the future installation of lighting on to the buildings. This will be one junction box per store front.

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.