Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 30, 2023

September 29, 2023

November 24, 2023

NE 24th St

Site Work

No Information to Display

$140,223.00

Public - City

img_map_placeholder

NE 24th St, Carnation, WA

Subscribe to View Full Documents

This project consists of connecting an existing water main to the existing distribution system, replacing water services, disinfecting and pressure testing, and other site improvements, as shown on the Plans and specified herein. Questions concerning the Contract Provisions will be taken by the Project Engineer at Gray & Osborne, Inc.'s Seattle office (206) 284-0860. The City expressly reserves the right to reject any or all bids and to waive minor irregularities or informalities, and to further make award of the project to the lowest responsive, responsible bidder as it best serves the interest of the City based on the sum of the Bid. SCOPE OF WORK The work specified in this Section consists of furnishing all labor, materials, and equipment necessary for construction of the NE 24th Street Water Main Improvements, as shown on the Plans, and hereinafter specified, in the City of Carnation. Work shall include, but not be limited to, the following: A. Connect existing 12-inch ductile iron water main to existing 8-inch steel water main in two locations. B. Cap and abandon existing 8-inch steel water main between connection points with 12-inch ductile iron water main. C. Furnish and install vertical and horizontal thrust blocks on existing 12-inch ductile iron water main. D. Test, disinfect, flush, sample, and charge piping as specified herein. E. Remove and wastehaul and replace existing water services. F. Install valve box and marker post at all existing buried valves. G. Install combination air and vacuum valve. H. Furnish and install fixed guard posts. I. Complete minor grading and other work as required to restore surfaces to their original condition. J. Complete all other work components as specified herein and as shown on the Plans

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.