Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 7, 2023

October 16, 2023

No Information to Display

To Be Determined

Remodeling, Renovation, Site Work

No Information to Display

$500,000.00

Public - Federal

img_map_placeholder

To Be Determined, Fort Smith, AR

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Project Description 1.1. Purpose 1.1.1. The purpose of this project is to construct a security fence around the Main Ramp perimeter for the new FMS mission that is expected to arrive at Ebbing Air National Guard Base (EANGB) (Fort Smith Municipal Airport (FSMA)) in August of Fiscal Year 2024. 1.2. Location of Work 1.2.1. Main Ramp at EANGB (FSMA), Arkansas 1.3. Services are required to perform construction to build a fence around the Main Ramp area, shown in Attachment A - Security Fencing Concept of Operations, as described herein. 1.4. Within this document, the following shall be consistent: 1.4.1. When "the Government" is mentioned, it is a representation of the Project Manager (PM), the Contracting Officer (CO), and the Contracting Officer Representative (COR). 1.4.2. When "the Contractor" is mentioned, it is a representation of the prime contractor, all sub-contractors, and all other parties working with or for the prime contractor. 2. Scope of Work 2.1. The Contractor shall furnish all surveys, design drawings, materials, labor, tools, equipment, transportation, supervision, and all other incidentals necessary to complete the work outlined in this Statement of Work (SOW) to construct a security fence around the perimeter of the Main Ramp area. 2.2. This project is a design-build contract. The Contractor shall be responsible for a complete 100% design, and corresponding construction to provide a complete and functional facility. The design shall be submitted for CO approval before any construction begins

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.