Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 30, 2023

September 29, 2023

No Information to Display

To Be Determined

Paving, Site Work

No Information to Display

$200,000.00

Public - State/Provincial

img_map_placeholder

To Be Determined, Burlington, VT

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

This project will consist of, but not be limited to, improvements to existing trail systems from station 24+00 to 34+75 including a new gravel surface, subbase fracturing, stone lined ditches with water bars as indicated in the drawings from Civil Engineering Associates dated July 2023. Directions: Enter the front gate off Ethan Allen Road. Proceed approximately 1/4 mile to the Red House on the left. Watch for Pre bid signs. Questions may be submitted until August 23, 2023, at 12:00pm. Questions should be submitted by email to the project manager and the architect.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.