Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 1, 2023

April 22, 2024

September 29, 2024

I-69

Paving, Site Work

No Information to Display

$5,765,000.00

Public - State/Provincial

img_map_placeholder

I-69, Lansing, MI

Subscribe to View Full Documents

4.94 mi of full depth concrete pavement repairs and bridge rehabilitation including deep overlay, rail patching, full depth patching, bearing replacement, substructure patching, epoxy overlay, pressure relief joints and approach work on I-69 from Airport Road to US-127, Clinton County. This project includes a 5 year performance warranty on thin epoxy overlay. Net classification required for this project is 5765 Ba Control Sec BFPI 19043 M 19043 Job No 212532A 211615A Federal No 23A0741 N/A MI DOT - 2309 037 - Full Depth Concrete Pavement Repairs and Bridge Rehabilitation Including Deep Overlay, Rail Patching, Full Depth Patching, Bearing Replacement, Substructure Patching on I-69

20 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects