Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 29, 2023

September 28, 2023

November 9, 2023

N St Albans Rd

Paving, Site Work

No Information to Display

$400,000.00

Public - City

img_map_placeholder

N St Albans Rd, San Gabriel, CA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

The work to be done consists of furnishing all materials, equipment, tools, labor, transportation, and incidentals as required by the Plans and Specifications, and contract documents. The general items of work include the replacement of broken 30-inch corrugated steel storm drain pipe with a new 30-inch x 295 feet long dual wall corrugated high density polyethylene (HDPE) pipe on St. Albans Road, which shall include the excavation, removal of existing pipe, cement slurry backfill, installation of new precast manhole, and repair of existing A.C. street pavement and curb & gutter after the required installation work is completed. Each bid shall be accompanied by a certified or cashier's check, cash, or bid bond in the amount of ten percent (10%) of the total bid price payable to City of San Gabriel as a guarantee that the awarded bidder will execute the Contract and provide the required bonds, certificates of insurance, and endorsements within seven calendars days of the of the award of contract by City Council. The City reserves the right after opening bids to reject any or all bids, to waive any informality (non-responsiveness) in a bid, or to make award to the lowest responsive, responsible bidder, and reject all other bids, as it may best serve the interest of the City. The bidder shall guarantee the Total Bid Price for a period of 90 calendar days from the date of bid opening. All questions relative to this project prior to the opening of bids shall be in writing or email and received no later than 4:00 p.m. on Tuesday, August 22, 2023, and shall be directed to: Public Works Project Manager, Alan Mai, at email: amai@sgch.org. All bidders shall be licensed in accordance with provisions of the Business and Professions Code and shall possess a Class "A" State Contractor's License at the time this contract is awarded. There is no pre-bid meeting for the project. The work to be done consists of furnishing all materials, equipment, tools, labor, transportation, and incidentals as required by the Plans and Specifications, and contract documents. The general items of work include the replacement of broken 30-inch corrugated steel storm drain pipe with a new 30-inch x 295 feet long dual wall corrugated high density polyethylene (HDPE) pipe on St. Albans Road, which shall include the excavation, removal of existing pipe, cement slurry backfill, installation of new precast manhole, and repair of existing A.C. street pavement and curb & gutter after the required installation work is completed. All questions relative to this project prior to the opening of bids shall be in writing or email and received no later than 4:00 p.m. on Tuesday, August 22, 2023, and shall be directed to: Public Works Project Manager, Alan Mai, at email: amai@sgch.org.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.