Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 23, 2023

September 25, 2023

November 24, 2023

4400 Government Blvd

Demolition, Site Work

No Information to Display

$50,000.00

Public - City

img_map_placeholder

4400 Government Blvd, Mobile, AL

Subscribe to View Full Documents

Bidders shall insert sealed Bids into a receptacle, marked "City of Mobile Bids" It is the responsibility of the Bidder to check for, download and to include with their Bid Response any and all Addendums that are issued for a specific Bid issued by the City of Mobile. Failure to download and include Addendum(s) in your Bid Response may cause your bid to be rejected. This is a sealed bid. Any responses faxed or e-mailed will be rejected. This is a sealed bid. It is the responsibility of the bidder to insure that their bid response is delivered to and received in the at the location or address specifically directed in the specification by the date and time prescribed. Provide a full "Wet Demolition" in removing the structure including all contents inside and as described in the attached general notes and specifications provided, including all foundations, footings, slabs, etc. All demolition material and debris shall be sent to an approved and Construction and Demolition (C&D) Landfills. Disconnect and cap off all utility lines, such as sanitary sewer, water, and gas, in a manner satisfactory to the respective agency and the City of Mobile. Contractor shall clear lot by removing all debris resulting from the demolition of structure and all debris as designated in piles, scattered or otherwise on the site. Contractor is to provide Sediment and Erosion Control measures, grassing, and Best Management Practices per specifications. Submit before and after demolition pictures to City of Mobile Municipal Enforcement Department, along with waste shipment record, application and certification for payment and required close-out documents. ANY ADDITIONAL QUESTIONS pertaining to this project, shall be directed to Gary Jackson, Deputy Director by emailed: gary.jackson@cityofmobile.org or phone at No questions will be answered after Friday, August 18. 2023 @ 3:00 p.m.

15 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.