Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 16, 2023

September 15, 2023

No Information to Display

To Be Determined

Service, Maintenance and Supply

No Information to Display

No Information to Display

Public - Federal

img_map_placeholder

To Be Determined, Oklahoma City, OK

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Install 8 combination Icemaker and Hot/Cold water dispensers in 8 different locations throughout B185 facility. This requirement will have multiple entities involved to accomplish the work outlined in accordance with the statement of work (SOW). A Combination Ice Maker and Hot/ Cold Water Dispenser Shall utilize the existing 115-120V outlets currently in place and the water supply currently in place and the drain line currently in place. The unit must be sized to fit in a space with the demotions of 29" wide by 60" High By 23" Deep. The unit must have a filtration process that includes a 3-stage system. This will include a Dual Reverse Osmosis, Pre-Carbon, Mineral Carbon and Sediment. This filtration system must be enclosed inside the unit. The unit must dispense Hot water from a .6 gallon reservoir and cold water from a 2 gallon reservoir with a 1 gallon flow rate per minute. The unit must produce 30lbs to 40lbs of ice per day. The unit must have touchless operation system. Contractor shall be responsible for providing all the tools necessary to install the machines. Contractor shall be responsible for all cleanup and the disposal of any waste generated through this CBR pertaining to the installation.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.