Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 25, 2023

November 27, 2023

December 31, 2026

Multiple Locations

Site Work

No Information to Display

$40,000.00

Public - City

img_map_placeholder

Multiple Locations, Baton Rouge, LA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

The services available under the Home Rehabilitation and Lead Hazard Reduction Program cannot be used to replace adequately functioning systems that do not present a hazardous or health and safety condition. Replacement of roof (30-year architectural shingles, synthetic roof felt, roof jacks, drip edge, and roof ventilation). Leaking or holes in the roof that cause interior damages and/or exposure to outside elements will be replaced. Roofs that are deteriorated or whose structure poses a hazard will be replaced. Window replacement or repair. If windows expose the home to the outside elements, they will be replaced or repaired. Replacement of exterior doors and weather-stripping. If doors expose the home to the outside elements, they will be replaced or repaired. Installation of combination smoke detector/carbon monoxide detector. If the smoke detector/carbon monoxide detector is broken or the home does not have one, a new one will be installed. Handicap accessibility for disabled owners. All handicap modifications or installations have to be ADA compliant. In accordance with the statute, contractors must be required to pay wages to laborers and mechanics at a rate not less than the prevailing wages specified in a wage determination made by the Secretary of Labour. In addition, contractors must be required to pay wages not less than once a week. The non-Federal entity must place a copy of the current prevailing wage determination issued by the Department of Labour in each solicitation. The decision to award a contract or subcontract must be conditioned upon the acceptance of the wage determination. The EBR Parish reserved the right in its sole discretion to select the response that best meets the needs of the city EBR Parish and to waive any informalities, technicalities, or irregularities in the response. The undersigned agrees to execute the Agreement and Affidavit and furnish to the EBR Parish all insurance certificates and performance bond required for the project within fifteen (15) calendar days after receiving notice of award from the EBR Parish. Question Deadline 10/11/2023 at 5:00 PM CT Community Meeting (In Person) The Executive Center 250 S. Foster Drive Baton Rouge, LA 70806 October 3, 2023 12:30pm CST & 6:00pm CST Community Meeting (Virtual) https://www.brla.gov/HousingRFP1230PM https://brla.gov/HousingRFP6PM October 5, 2023 12:30pm CST & 6:00pm CST

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects