Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 31, 2023

June 17, 2024

August 28, 2024

Multiple Locations

Paving, Site Work

No Information to Display

$300,000.00

Public - State/Provincial

img_map_placeholder

Multiple Locations, Butte, MT

Subscribe to View Full Documents

The Butte Urban Pave Pres project consists of multiple streets in the City of Butte, Silver Bow. - Excelsior Ave. begins at Platinum St. and ends at Caledonia St. The route length is 0.623 miles and will consist of a chip seal and pavement markings. - Park St. begins at Montana St. and ends at Mining Museum Rd.at. The route length is 1.128 miles and will consist of a chip seal and pavement markings. - Shields Ave./ Farrell Street begins approximately 350 ft north of the bridge over the railroad on Shields Ave. and ends just past the Montana Resources railroad crossing near Stuart Ave. The route length is 1.005 miles and will consist of a milling, paving, chip seal, guardrail, and pavement markings. - Grand Ave begins at Harrison Ave. and ends at Continental Dr. The route length is 1.360 miles and will consist of a chip seal, crack seal and pavement markings. - Amherst Ave. begins at the intersection of Harrison Ave. and ends at Continental Dr. The route length is 0.988 miles and will consist of a chip seal, crack seal and pavement markings. - Elizabeth Warren begins at Harrison Ave. and ends at Continental Dr. The route length is 1.385 miles and will consist of a chip seal, crack seal and pavement markings. - Four Mile Rd. Begins at Harrison Ave. and end ends at Holmes Ave., via Utah Ave., Electric St., and Western Blvd. The route length is 1.811 miles and consists of a chip seal and pavement markings with some milling and paving on Four Mile Rd. Contract to be completed as outlined in the Contract Time special provision found in the proposal. The Disadvantaged Business Enterprises contract goals are 0.00% This project is under the jurisdiction of the Butte District Administrator. Uniform No. 10251000 MT DOT - 205 - Butte Urban Pave Pres

5 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.