Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 21, 2023

October 23, 2023

No Information to Display

Multiple Locations

Renovation

No Information to Display

$240,130.00

Public - City

img_map_placeholder

Multiple Locations, Oakland, CA

Subscribe to View Full Documents

The project will install rail safety, pedestrian improvements, and "quiet zone" improvements, including a fence along the tracks at designated crossings along the Embarcadero railroad corridor. Other safety elements include, but are not limited to, geometric improvements, new and existing traffic signals, pavement engineering, green infrastructure, and utility related designs. Access for pedestrians is enhanced between downtown and the waterfront/Jack London Square by adding a Class I path (for bicyclists and pedestrians) between Martin Luther King Jr. Way and Webster Street. Included in this scope of work, feasibility studies of new and existing grade separated railroad overcrossing features will be developed and analyzed for implementation in the project area in collaboration with stakeholders. Completion of subsequent phases of the designs of these structural features are an optional task pending approval described in the detailed scope of services. Primary scope of services includes, but are not limited to, developing engineering design and cost estimates, feasibility studies and concept development, environmental clearance, stakeholder and utility owner coordination, right of way investigation and analysis, and to provide community engagement support.

42 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.