Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 6, 2023

November 6, 2023

December 5, 2024

5884 A St

Paving, Renovation, Site Work

No Information to Display

$3,169,000.00

Public - State/Provincial

img_map_placeholder

5884 A St, Alpena, MI

Subscribe to View Full Documents

Addition of vehicle storage garage, reconfigure existing toilet and shower rooms, provide space for a lactation room, renovate offices and lobby, renovate classrooms, replace existing vault door, related MEP upgrades, parking lot improvements including security measure upgrades and paving renovations Please do not submit online questions via SIGMA VSS. ALL questions should be emailed to Tim Miller at tmiller@sidockgroup.com no later than 5:00 p.m., Eastern August 25, 2023. Addition of vehicle storage garage, reconfigure existing toilet and shower rooms, provide space for a lactation room, renovate offices and lobby, renovate classrooms, replace existing vault door, related MEP upgrades, parking lot improvements including security measure upgrades and paving renovations per drawings and specifications dated 8-1-2023. Please do not submit online questions via SIGMA VSS. ALL questions should be emailed to Tim Miller at tmiller@sidockgroup.com no later than 5:00 p.m., Eastern August 25, 2023. Furnish all equipment, materials, labor, and services necessary to complete all building demolition required in connection with the existing building, in order to permit the installation of new Work. The goal of the Owner is to generate the least amount of waste or debris possible. However, inevitable waste and debris that are generated shall be reused, salvaged, or recycled, and disposal in landfills shall be minimized to the extent economically feasible. The Contractor will be required to prepare waste management plan for the collection, handling, storage, transportation, and disposal of the waste generated at the construction site for the Owner's review and approval. The Contractor will be required to produce waste management progress reports.

15 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.