Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 8, 2023

October 9, 2023

No Information to Display

Multiple Locations

New Construction, Site Work

No Information to Display

No Information to Display

Public - State/Provincial

img_map_placeholder

Multiple Locations, Middletown, PA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

The approximate size of each contract is estimated as between $38,000,000 to $53,400,000. Project Description The Pennsylvania Turnpike Commission is currently preparing plans for construction of a replacement New Cumberland Maintenance Facility complex on the current Maintenance site and adjacent wooded area to the East. The site is on the Eastbound side of the Turnpike (I-76), from Milepost 243.7 to Milepost 244.5 and North of Marsh Run Road. The project includes construction of four buildings and demolition of existing buildings. The first building will consist of an Administrative Offices area wing connect to a Vehicle Maintenance & Repair wing with three dedicated service bays, a wash bay, and a welding shop. The Second building is for Equipment Storage, and the third and fourth buildings are salt storage buildings. In addition, the work includes site improvements including, but not limited to, grading, pavement, utilities, fencing, landscaping, underground fuel storage tanks, and a covered vehicle fuel dispensing island. The approximate size of each contract is estimated as noted below: CONTRACT NO. T-243.80F001-3-02 - GENERAL CONSTRUCTION - between $38,000,000 to $53,400,000 CONTRACT NO. T-243.80F001-3-03 - PLUMBING WORK - between $2,300,000 to $3,700,000 CONTRACT NO. T-243.80F001-3-04 - ELECTRICAL WORK - between $4,400,000 to $6,400,000 CONTRACT NO. T-243.80F001-3-05 - HEATING VENTILIATION & AIR CONDITIONING - between $2,200,000 to $3,200,000 Contractors who have not been prequalified through this process will not be permitted to bid on this contract. Subcontractors are not required to be prequalified. For questions concerning the special prequalification process, the prequalification application and instructions, or the project, please contact Vincent Buser at telephone: (717) 712-7943; e-mail: vbuser@paturnpike.com. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Completed prequalification applications will be evaluated as they are received. It is the intention of the Turnpike Commission to provide a list of prequalified firms to contractors when the project contract documents are released to the public in Winter 2023. This list will be comprised of firms prequalified by the Turnpike Commission only.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects