Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

February 23, 2024

February 23, 2029

Multiple Locations

Service, Maintenance and Supply

No Information to Display

No Information to Display

Public - State/Provincial

img_map_placeholder

Multiple Locations, Effingham, IL

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

The Complexity Factor for this project is 0. This project requires 25% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. Phase III engineering services are required to provide assistance in construction inspection services for construction projects throughout District Seven. The Consultant will be required to furnish one (1) to six (6) qualified staff as approved by the District to assist District Resident Engineers/Technicians in performing the required construction inspection, materials inspection, survey/layout, prepare records, maintain documentation, provide general assistance as a member of a field crew and other duties to allow the timely completion of projects in accordance with state specifications. Projects requiring staffing may include, but not limited to, District wide patching and resurfacing contracts, or specific bridge projects, or urban rehabilitation projects. Quality Assurance (QA) oversight and Contractors Quality Control (QC) by the same Consultant or one of their Subconsultants on the same project or on material coming in from the same plant are prohibited. At the initial meeting, the Prime Consultant, and Subconsultant(s) will disclose all current relationships with contractors. Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The Prime firm must be prequalified in the Special Services (Construction Inspection) category to be considered for this project The method of contractor selection has not been determined at this time. IDOT - 033 - RFQ - Various Phase III Construction Inspection Projects

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects