Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

February 23, 2024

February 23, 2029

Multiple Locations

Service, Maintenance and Supply

No Information to Display

No Information to Display

Public - State/Provincial

img_map_placeholder

Multiple Locations, Carbondale, IL

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

The Complexity Factor for this project is 0. This project requires 22% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. Phase I work, if required, may consist of conducting route surveys, hydraulic surveys, drainage studies, hydraulic analysis, geometric studies, preparing Bridge Condition Reports, Hydraulic Reports, Structure Reports, Structure Geotechnical Reports, and preparing Project Reports (Categorical Exclusion projects only). This work will include data collection, development of alignment alternatives, cost estimates, traffic management analysis, accident analysis, TS&L drawings, right of way information, preparation of environmental documentation for submittal by District, environmental consequences, and other related work necessary to produce Project Reports for bridge or roadway projects. Phase II work, if required, may consist of route surveys, hydraulic analysis, geometric studies, roadway plans, structure plans, highway lighting, ADA plan development, preparation of pre-final plans for bridge or roadway projects, and any other work to complete final plans, specifications, and estimates for bridge or roadway projects, as necessary. The various proposed projects may consist of simple patching and resurfacing, bridge repair, bridge rehabilitation, bridge replacement, culvert replacement, widening and resurfacing, and/or new roadway projects. The department will furnish the Consultant with any available as-built plans, microfilm plans, field notes, traffic data, accident statistics, agency coordination, existing right-of-way plans, aerial photos, boring logs, and other information. The Consultant's work may consist of either complete projects or a portion of the total engineering required for a certain project. Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The Prime firm must be prequalified in the following categories to be considered for this project: Highways (Roads and Streets) Location Design Studies (Rehabilitation) Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). The method of contractor selection has not been determined at this time. IDOT - 039 - RFQ - Various Phase I/II Projects, Various Routes, Various Counties, Region Five/District Nine

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects