Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
No Information to Display
August 27, 2024
No Information to Display
301 Bear Creek Rd
Renovation, Site Work
No Information to Display
No Information to Display
Public - Federal
301 Bear Creek Rd, Knoxville, TN
Project 9225-03 Utility Upgrades and Equipment Project (UUEP) at Y-12 National Security Complex, Oak Ridge, Tennessee Introduction Consolidated Nuclear Security, LLC, (CNS) is seeking interested parties to contract for the site demolition, preparation, and installation of existing and new utilities and equipment for the 9225-03 Utility Upgrades and Equipment Project (UUEP), a CNS design-bid-build project. CNS prefers to contract with one entity capable of performing the activities generally outlined herein. The successful bidder (Contractor) will be responsible for the build phase (construction) of this project. Interested parties are encouraged to reply to the expression of interest if you can provide one or more of the services listed below. CNS will use the information obtained from this Expression of Interest (EOI) and the informational meeting to structure a Request for Proposal (RFP). Background The Y-12 National Security Complex is located in Oak Ridge, Tennessee. It is a Department of Energy (DOE) National Nuclear Security Administration (NNSA) national security complex managed and operated by CNS. General Scope Description for 9225-03 Utility Upgrades and Equipment Project The project site is located at the existing building 9225-03, adjacent to Poplar Creek, inside the Y-12 Property Protection Area (PPA). The purpose of the UUEP is to upgrade the utilities and infrastructure of the existing 9225-03 facility to support the installation of future production equipment that will allow Y-12 successfully fulfill its role in meeting future mission needs. UUEP will include both Base Scope (Utility and Infrastructure Upgrades) and Optional Scope (Future Production Equipment Installation). Design of the Utility Upgrades, which includes commercially off the shelf (COTS) type utility equipment, is currently being developed by Jacobs Technology, Inc. Base Scope The scope includes furnishing all non-manual labor, craft labor, supervision, materials, tools, equipment, services, inspections, tests, incidentals (except as specified to be furnished or performed by others) and anything else necessary for construction in accordance with approved design documents including, but not limited to the following: * Site prep - Construction staking/survey; construction barricades and temporary fencing; storage, staging, laydown, fabrication,parking, and jobsite office-trailer areas; locate/pot-hole utilities; erosion prevention and sediment controls; shoring; termination/isolation of power and hazardous energy sources; temporary utility services; etc. * Demolition - Emergency notification system; fire alarm system; interior air-handling units and ancillary systems in two mechanical rooms, including housekeeping pads; lighting; saw cutting; overhead power line pole; wheel stop curbs; parking lot striping; demolition of a portion of existing fire suppression system components and deluge system; etc. * Civil - Site excavation for foundations, pads, piers, and utility trenches; site grading and backfill; site restoration (pavement, seeding, etc.); installation of bollards; secondary containments; modification to storm sewer, sanitary sewer, and roof drains; water line extension; etc. * Architectural - Repair floor drains; remove/replace door panels and hardware; wall removal/demolition for doors and openings; installation of insulated coiling door; fireproof coating repairs; wall installation of various types, including fire rated; fabrication and installation of equipment mezzanine; remove/replace ceiling tiles; specialty protective coatings; etc. * Structural - Exterior wall modifications for roll-up door; foundation improvements; supports for building utilities; exterior foundations slabs for new utility support equipment; secondary containment for transformers; pipe racks; specialty protective coatings; etc. * Fire Protection - Upgrades to the existing fire suppression system, including pipes, supports, and heads. * Mechanical - Installation of exterior air handling equipment, exhaust stack, ductwork, and HVAC system; cooling towers; expansion tanks; pumps; valves; piping, supports, and in-line components and instruments for cooling water, potable water, nitrogen, helium, argon, and compressed air systems; new interior air handling equipment and ancillary components; insulation; specialty protective coatings; heat trace; etc. * Electrical - Electrical upgrades to support the new demands of the facility, including unit substations with transformer and switchgear, accusine meters, switchboard, automatic transfer switch, diesel generator, raceways, conduit, and underground cables; overhead power line modifications and new pole replacement; modifications/upgrades to emergency notification system, fire alarm system, classified and unclassified networks, lightening protection system; etc. * Delegated design - exhaust stack and support structure; walk-in hoods; workstation bridge crane; direct digital control (DDC) system for HVAC; etc. CNS will procure engineered equipment to supply as Government Furnished Equipment (GFE) to the Contractor. A number of GFE items have been identified this project. * Base Scope GFE - Unit substations (3) ea. w/ a transformer and switchgear; accusine Meter (6); switchboard; automatic transfer switch; 1500 kW diesel generator; 150-ton chiller (2); 265-ton chiller (1); 300-ton dry wheel dehumidification unit; close loop cooling tower (3); etc. Optional Scope Design of the Equipment Installation scope is currently conceptual in design but will be developed by mid- to late-2024, under a separate, forthcoming A/E service subcontract. The forthcoming construction statement of work (SOW) for the UUEP will include, but is not limited to, the Issued for Construction (IFC) Utility Upgrades design package and conceptual/early design information and layout, as well as other pertinent information that will give the ability to initially bid. The scope includes furnishing all non-manual labor, craft labor, supervision, materials, tools, equipment, services, inspections, tests, incidentals (except as specified to be furnished or performed by others) and anything else necessary for construction in accordance with approved design documents including, but not limited to the following: * Civil/Structural/Architectural - Placement of new production equipment, including anchorage and supports. * Fire Protection - Modifications to fire sprinkler system. * Mechanical - System tie-ins to new production equipment, including piping and in-line components. * Electrical/Instrumentation/Controls - Electrical system tie-ins to new production equipment; install integral controls, instrumentation, and control user interfaces. CNS will procure engineered equipment to supply as Government Furnished Equipment (GFE) to the Contractor. A number of GFE items have been identified this project. * Optional Scope GFE - Hot uniaxial press (2); tube furnace; aluma lift; chemical fume hoods; hydraulic press; vacuum over; special tube carts; etc. Summary The UUEP will be executed using as Lump Sum per Line Item subcontract. UUEP scope of work will be performed by the selected bidder using the trade off approach evaluation. More information on this procurement, meetings, and informational sessions will be forthcoming. If you are interested in participating, provide your company's general qualifications, related experience and your envisioned role by August 27, 2023 to Thomas Nielander, thomas.nielander@pxy12.doe.gov. The method of Contractor Selection has not been Determined at this time.
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Knoxville, TN
Bid Date: Jul 05 2023
Knoxville, TN
Bid Date: Aug 03 2023
Knoxville, TN
Bid Date: Jul 31 2023
Knoxville, TN
Bid Date: Aug 03 2023
Knoxville, TN
--
Knoxville, TN
Bid Date: Jul 27 2023
Knoxville, TN
Bid Date: Jul 19 2023
Knoxville, TN
Bid Date: Jun 29 2023
Knoxville, TN
Bid Date: Aug 25 2023
Knoxville, TN
Bid Date: Aug 04 2023
Knoxville, TN
Bid Date: Aug 04 2023
Smyrna, TN
Bid Date: Jul 12 2023
Decaturville, TN
Bid Date: Aug 07 2023
Decaturville, TN
Bid Date: Aug 07 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
