Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

February 23, 2024

November 24, 2025

Multiple Locations

Service, Maintenance and Supply

No Information to Display

No Information to Display

Public - State/Provincial

img_map_placeholder

Multiple Locations, Schaumburg, IL

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

The Complexity Factor for this project is 0. This project requires 25% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. Phase III engineering services are required to provide an improved transportation system for Illinois Route 47 (IL 47). Improvements to this route include, but are not limited to, the need to address vehicular and pedestrian safety. Total length of the project is approximately 1.8 Miles. Both legs of Illinois Route 176 (IL 176) at IL 47 were improved in the summer of 2010. The improvements added a dedicated right turn lane to separate left and right turning vehicles. While this improvement relieved some congestion and reduced crashes at the IL 176 intersections, travelers at other locations on IL 47 continue to experience heavy congestion and delay. The congestion and delays can only be reduced by adding lanes over the entire project length. IL 47 intersects IL 176 in two locations, each consisting of a signalized T-intersection; the state highways share designation for approximately 0.9 miles. Both East and West legs of IL 176 consist of one 12-foot departing lane and two 12-foot approach lanes providing separate left and right turn lanes for vehicles turning from IL 176 to IL 47. Improvements along IL 176, at both intersections, will provide dual left turn lanes and free flow right turn lanes and acceleration lanes from IL 176 to IL 47 to accommodate the heavy turning movements. At both IL 176 intersections, the proposed improvement along IL 47 will provide dual-left lanes and a right-turn lane and an additional through lane in each direction. Various drainage, ADA lighting improvements are also proposed. Any and all incidental work needed to complete the improvement Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The Prime firm must be prequalified in the Special Services (Construction Inspection) category to be considered for this project. Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS) The method of contractor selection has not been determined at this time. IDOT - 010 - RFQ - IL 47 at IL 176 (N&S Jct) & at Pleasant Valley Rd, Phase III Project

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.