Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 21, 2023

November 20, 2023

January 22, 2024

To Be Determined

Demolition, New Construction, Paving, Site Work

No Information to Display

$19,088,000.00

Public - County

img_map_placeholder

To Be Determined, Montgomery, TX

Subscribe to View Full Documents

Estimate: $18M The work consists of providing the necessary labor, materials, equipment, supervision, and plant for the construction of the wastewater treatment plant replacement work including but not limited to: main process basins; aerobic digesters; electrical building; non-potable water pump station; chemical building and storage; blowers; generator and fuel tanks; electrical service; sump pump station; WAS pump station; site grading and drainage structures; concrete paving; crushed concrete paving; piping, manholes, and inlets; protective coatings; electrical; controls; hydro-mulch seeding; duct bank and pull boxes; demolition items as specified; temporary facilities and all else specified on the construction drawings and contract documents necessary to construct, tie-in and make for a complete and operational system. Final completion shall be achieved within 60 calendar days from the date of Substantial Completion. The Owner reserves the right to reject any or all bids and waive any or all irregularities. No bid may be withdrawn until the expiration of 90 calendar days from the date bids are open. In ample time to permit consideration before reply, submit questions about bidding instruments to the Engineer. Questions will not be considered after 12 p.m. noon on Thursday, September 14, 2023.

213 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects