Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 23, 2023

October 1, 2023

August 31, 2025

Multiple Locations

Service, Maintenance and Supply

No Information to Display

No Information to Display

Public - State/Provincial

img_map_placeholder

Multiple Locations, Austin, TX

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Fire Alarm Inspection, Maintenance and Repair Services in various facilities managed by the Texas Facilities Commission located in Austin, Texas. As-needed services may be request throughout Texas. a) Services shall include: i) Inspections and Tests. Individual building fire alarm systems will be inspected in accordance with the applicable codes, including but not limited to the National Fire Protection Association ("NFPA") Codes and Standards for the applicable component being tested, specifically NFPA 70, 72, 90A, and 101. Inspections shall be conducted in accordance with the requirements of Chapter 14, Inspection, Testing and Maintenance, of the NFPA 72, National Fire Alarm and Signaling Code edition adopted by the Texas State Fire Marshal. Inspections will include verification of transmission of all alarm, trouble and supervisory signals to TFC's monitoring stations or fire alarm systems that transmit full point reporting and/or graphics to TFC's monitoring stations, Contractor shall verify transmission of each individual point to TFC's monitoring stations and verify that the alphanumeric point description transmitted to TFC's monitoring stations and the graphic representation at TFC's monitoring station is in agreement with the alphanumeric point description registered at the fire alarm control panel in the applicable building. ii) Deficiency Reporting. At the completion of inspection, provide a report noting discrepancies and a quote to remedy the discrepancies. iii) As-needed services. TFC may request repairs, modifications, upgrades, or changes to existing systems. Contactor shall provide a quote for requested changes and perform services in accordance with contract documents. TFC reserves the right to change the dates in the Schedule of Events set forth below upon written notification to prospective Respondents through a posting of an addendum on the ESBD Question Deadline 08/08/2023 at 12:00 PM CT

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.