Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 17, 2023

November 16, 2023

August 12, 2024

To Be Determined

Site Work

No Information to Display

$500,000.00

Public - County

img_map_placeholder

To Be Determined, Edgewater, MD

Subscribe to View Full Documents

Question Deadline 08/31/2023 at 5:00 PM ET The Work includes the following major items: Install approx. 663 linear feet of 1" copper water line connection to existing 8" water line, install water meter, and yard hydrant; install new gravel driveway; install new chain link fence; install buried concrete bypass vault and connect to existing pump station dry well; replace pumps, piping, gate valves, check valves, and sump pump in existing dry well; replace ladder in existing wet well; remove existing interior paint by chipping away loose paint and repaint interior of drywell; provide bypass pumping; and providing new emergency generator and electrical controls, all as indicated on the Contract Drawings. The cost range for the Project is: $ 1,000,000 up to but not including 1,500,000. Replacement of existing sewage pumps o Replacement ofsuction and discharge piping o Replacement of isolation and check valves o Replacement of electrical equipment indicated on the contract drawings o Replacement ofdry well ventilation system to comply with current County standards and NFPA 820 requirements o Installation ofnew buried concrete bypass connection and valve vault o Installation ofdehumidifier and wet well fan. o Dry well protective coating system. o Installation ofwet well level transducer system o Installation of a permanently mounted backup diesel pump o Demolition ofvarious equipment and materials in order to conduct new work o Bypass pumping to allow performance ofthe work o Alternate: installation of663 linear feet of 1" water line connection to existing 8" water line and install water meter and yard hydrant.

9 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.