Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 12, 2023

October 15, 2023

March 31, 2024

To Be Determined

Service, Maintenance and Supply

No Information to Display

No Information to Display

Public - State/Provincial

img_map_placeholder

To Be Determined, Sunshine Valley, BC

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

The proposed contract is for snow removal and application of sand and salt from 0.0 km to 1.3 km on the Sumallo Forest Service Road. The Sumallo Forest Service Road (FSR) is located approximately 20 km south east of Hope on Hwy 3 and provides access to the recreational community of Sunshine Valley. Repaving operations in September 2014 over the first 1.3 km of the FSR resulted in a slightly wider road than previous and elimination of much of the unevenness of the previous asphalt. The contractor shall carry out snow removal/snow plowing any time snowfall accumulations reach a maximum depth of 5" (12.5cm), or within 8 hours of receiving a request for snowplowing from the Contract Officer, whichever comes first. The Contractor, on his own accord shall monitor snowfall depths and when or before snowfall reaches a depth of 5" on the road, shall carry out snow removal/plowing of the road. The Contractor shall also apply sand and salt (3 m3 per application) to maintain the road surface safe and open to residential and recreational traffic, as directed by the Contract officer. Sand and salt mixture shall be applied to the full width of the plowed road. Up to 10 applications of sand and salt mixture may be applied during the life of this contract. Question Deadline 09/01/2023 at 12:00 PM PT The term of the contract will be from October 15, 2023 to March 31, 2024

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects