Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

January 1, 2024

February 10, 2025

109 Bee St

Paving, Renovation, Site Work

No Information to Display

No Information to Display

Public - Federal

img_map_placeholder

109 Bee St, Charleston, SC

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

This Pre-solicitation Notice is NOT A REQUEST FOR PROPOSAL. ALL INFORMATION NEEDED TO SUBMIT SF330 DOCUMENTS ARE CONTAINED HEREIN. NO ADDITIONAL SOLICITATION PACKAGE OR TECHNICAL INFORMATION WILL BE ISSUED. Project: 534-23-912 AE Design-Replace/Increase Loading Capabilities for Charlie & Delta Street Work Location: Ralph H. Johnson VA Medical Center, Charleston, SC Estimated/Target Completion Period: 406 calendar days after Notice to Proceed (NTP). Construction Magnitude: Between $5,000,000 and $10,000,000 NAICS: 541310 - Architectural Services Small Business Standard: $12.5 Million Set-Aside: 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) Site Visits will not be arranged during this phase. The anticipated award date of the proposed A-E Contract is on or before December 31, 2023 SF 330 Date of Receipt/Due Date: Interested firms having the capabilities to perform this work must submit one (1) electronic SF330 and attachments if any) no later than (NLT) 2:00 PM (EST) August 31, 2023. PROJECT OVERVIEW: Provide Professional Architect/Engineer (A/E) and healthcare planning services necessary to Project will fully replace and increase loading capabilities for Charlie Street, Delta Street up to the Front Lobby Canopy, the ramp up to Charlie/Delta streets, and the ED Ambulance Pad. Remove and replace piles, pile caps, beams, road deck, and sidewalk on Charlie and Delta Streets as denoted on accompanying For Information Only drawings areas S-1, S-2, and S-3. Add structural elements as shown. The final structure shall support HS20-44 and 66K max gross load w/ three (3) axles min (56" max tandem, 28" per rear axle) per SC CODE ANN 56-5-4140 B2. Remove and replace all structural connections between the road and any outside structural element (building, retaining wall, etc.) as required. Ensure that all connections to outside structural elements are maintained during and after construction. Remove and replace all existing storm water infrastructure and alter other existing utilities as required in the construction areas. Ensure new structure is graded for positive drainage away from the building to new storm water infrastructure. The designer shall review the information provided by the VA and provide separate and complete site investigations to provide a design that complies with the latest version of the IBC, ASCE 7, and all other applicable codes and standards to meet the requirements listed above. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.