Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 7, 2023

October 9, 2023

January 30, 2024

1701 MS-25

Demolition, Site Work

No Information to Display

$208,845.00

Public - Federal

img_map_placeholder

1701 MS-25, Amory, MS

Subscribe to View Full Documents

Prospective bidders are encouraged to monitor the Mississippi Department of Finance and Administration website for updates and future bidding opportunities. The Adjutant General reserves the right to reject any and/or all bids and to waive informalities. Award of contract is subject to availability of funds. The Site located at 1710 MS-25 in Amory, Ms is to be completely demolished and returned to a natural site. Remove all existing structures, flat work, foundations, utilities to the main source and cap according to applicable Codes. Level and grade site, free of debris. Infill with new soil, as needed, and seed. Contractor is authorized to recycle any materials deemed valuable at their expense. PART II DESCRIPTION OF BID ITEMS: 2.01 Base Bid: All labor, material, and machinery necessary to complete the Work. PART III GENERAL: 3.01 The Owner reserves the right to accept any/or all Bid Items and to make award based upon the lowest and best overall Base Bid and/or any combination of the Bid Items in order to provide the Owner flexibility to award the contract within funding available. 3.02 Unit Prices shall be used in determining additions to or deductions from the contract amount when authorized changes are directed in the work as shown or specified in the original contract drawings and documents. They will apply only when such changes involve materials, specifications, methods, and designs of the same as those required in like work shown and/or specified. They will not be applied to changes requiring use of materials, specifications, or design of different character from those approved for general use under the contract as originally drawn. Unit Prices shall include the furnishing of all labor and materials, complete in place, unless otherwise noted.

22 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects