Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 24, 2023

September 25, 2023

November 13, 2023

950 W Mall Square

Site Work

No Information to Display

$480,000.00

Public - City

img_map_placeholder

950 W Mall Square, Alameda, CA

Subscribe to View Full Documents

This Project is situated on the following City streets: West Mall Square, West Midway, Lexington and Saratoga Avenue Approximate cost of base bid: $480,000 The Project includes, but is not limited to, performing the following Work: Furnishing all labor, tools, equipment, materials, except as herein specified; and doing all work associated with converting the lawn surrounding Alameda City West Hall at 950 West Mall Square, Alameda, CA 94501 to a drought tolerant landscape, as detailed in the Project Plans. Please direct any Project questions on or before end of business on August 17, 2023 to Erin Smith, esmith@alamedaca.gov, 510-747-7938. No bids will be accepted from a Contractor who has not been licensed in accordance with Business and Professions Code section 7000 and following. The license requirement for this Project is Class C-27.

8 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.