Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 7, 2023

October 9, 2023

August 4, 2024

Multiple Locations

Site Work

No Information to Display

$225,000.00

Public - City

img_map_placeholder

Multiple Locations, Hinton, WV

Subscribe to View Full Documents

The work shall consist of installation of approximately 5,395 LF of HDPE storm pipe ranging in size from 10 to 24, 49 catch basins, 265 LF of 12, 10 LF of 15 and 360 LF of 18 PVC sanitary sewer pipe, 640 LF of 6, 1,740 LF of 8, 605 LF of 10, 1,540 LF of 12, 2,475 LF of 14 and 415 LF of 18 DIP sanitary sewer pipe, 49 sanitary sewer manholes, one (1) lift station, two (2) grinder lift stations, surface restoration, reconnection of existing lines and all other necessary appurtenances. The Work will be substantially completed within 270 days after the date when the Contract Times commence to run and ready for final payment within 300 days after the date when the Contract Times commence to run. Liquidated Damages Rate is $1,000.00 per day Installation of storm pipes, sewer pipes, catch basins, manholes, lift stations, and restoration Damages Rate is $1,000.00 per day. The Work will be substantially completed within 270 days after the date when the Contract Times commence to run and ready for final payment within 300 days after the date when the Contract Times commence to run. The Owner reserves the right to reject any or all bids. A five percent (5%) Bid Bond or certified cashiers check must accompany all Bids. The successful Bidder will be required to furnish a satisfactory Payment Bond and Performance Bond, each for 100% of the contract amount.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.