Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 29, 2023

September 28, 2023

December 17, 2023

325 W Orchard Ave

Site Work

No Information to Display

$387,000.00

Public - City

img_map_placeholder

325 W Orchard Ave, Grand Junction, CO

Subscribe to View Full Documents

Reference Number 0000326617 *The City of Grand Junction is soliciting competitive bids from qualified and interested Contractors for all labor, equipment, and materials required for the Westlake Park Irrigation System Construction. All dimensions and Scope of Work shall be verified by Contractors prior to submission of bids.* Question Acceptance Deadline 08/17/2023 at 5:00 PM MT Questions are submitted online No General Requirements - FOB Destination - FOB Pre-Paid - Insurance Required Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Payment Bond 100 % The goal of the Westlake Park Irrigation System Project is to replace the entire irrigation system. This Project will replace all mainline, lateral line, communication lines, valve, and sprinklers in the park to provide even and efficient water distribution to the existing grass and the future improvements of the park. This Project includes the material sourcing and installation of the communication system, the filtration system, the drip system, and sprinkler systems, while installing and maintaining the tree protection zones provided in the plan set. During this Project's work, the sidewalks, playgrounds and skateparks are to stay open and clean. The disk golf course will be closed. Open trenches will be made obvious to park users and back filled/water settled once pipe is installed. The pump house will be reconfigured using the existing pump. At completion of the Project, the selected Contractor will provide the City with an accurate as built document and GPS coordinates for valves, mainlines (every 20'), and the communication path (every 20'). The Contractor will provide a warrantee on all work for 1 year after the date of completion.

17 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects