Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 25, 2023

September 25, 2023

November 24, 2023

14313 Old Hwy 99

Site Work

No Information to Display

$100,000.00

Public - Federal

img_map_placeholder

14313 Old Hwy 99, Konawa, OK

Subscribe to View Full Documents

Site Directions: Project is located approximately 4 miles east of Konawa. The physical address is 14313 Old Highway 99, Konawa, OK. This project consists of furnishing all required materials, supplies, equipment, tools, and personnel to perform all necessary labor for the construction of two (2) Water Wells for the Konawa Child Care Facility. in the Procurement Office of the Seminole Nation, at P.O. Box 1498, Wewoka, OK 74884 or 36645 US HWY 270 Wewoka, OK 74884, until 2:30 p.m., Central Local Time, on August 25, 2023, for the construction of Konawa Child Care Water Wells. Bids shall be opened at the above stated time for receipt of Bids or as soon thereafter as practicable. This project consists of furnishing all required materials, supplies, equipment, tools, and supervision to perform all necessary labor for the construction of Construction of two (2) wells, slab, building, waterline, meters, valves testing (as required by DEQ) and all appurtenances. This project is eligible for sales tax exemption Questions regarding documents, discrepancies, omissions, or intent of the specifications or drawings shall be submitted in writing to the Owner through the Engineer at least seven (7) days prior to opening of bids to provide time for issuing and forwarding an addendum. Any interpretation of the contract documents will be made only by addendum duly issued or delivered by the Owner to each person receiving a set of documents. The Owner will not be responsible for any other explanations or interpretation of the contract documents. This project consists of furnishing all required materials, supplies, equipment, tools, and supervision to perform all necessary labor for the construction of Construction of two (2) wells, slab, building, waterline, meters, valves testing (as required by DEQ) and all appurtenances.

6 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.