Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 18, 2023

September 18, 2023

No Information to Display

Multiple Locations

Service, Maintenance and Supply

No Information to Display

No Information to Display

Public - County

img_map_placeholder

Multiple Locations, Libertyville, IL

Our team is requesting plans for this project.

Subscribe to View Full Documents

The Lake County Forest Preserve District (Owner) is bidding out four (4) clearing projects located in Lake County, Illinois. Bidders can bid on one, or multiple projects. The Owner intends to award each project individually to the lowest responsible and responsive bidder. Each project is described under Attachment B, Section 2 (Title, Description, Coordination, Goals, and Scope of Clearing Operations). Any exceptions to the standard clearing specifications outlined in Sections 3, 4 and 5 and Attachment D shall be noted in Section 2. In general, the Work of these projects includes all labor, equipment, and materials to selectively remove invasive woody trees and shrubs and thin select native species. Owner-approved cutting methods shall be described in Section 2 and Section 3. Extreme care shall be taken when conducting work within the Work Sites to lessen damage to native vegetation. Work shall include cutting, log removal (select projects only), brush pile burning or chipping, selective wick herbicide application to cut stumps and follow-up foliar wick application to resprouts and small stems. Some project areas may overlap with District trails. During snow fall, recreational trails are not plowed and special consideration of trail users will be necessary. When conditions are favorable for cross country skiing, Contractor shall minimize use of trail access as much as possible. Public access will remain open during the duration of the project.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects