Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 13, 2023

May 13, 2024

May 13, 2027

To Be Determined

Service, Maintenance and Supply

No Information to Display

No Information to Display

Public - City

img_map_placeholder

To Be Determined, Los Angeles, CA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

This RFQ shall not be limited to: the design, engineering, fabrication, purchase, installation, maintenance and/or repair of chain-link fencing (permanent or temporary fencing), backstops, omega fencing, all ornamental fencing (including tubular and solid bar), automatic driveway gates, tubular driveway gates (i.e., rhino gates), guardrails, flag poles, wood-creek/recycled lumber fences, all golf fence netting systems, masonry walls (including retaining walls and block walls), gates, and retractable gates. The purpose of this RFQ is to pre-select a qualified bench of vendors for as-needed fence and wall installation, maintenance and/or repairs. This RFQ is the first of a two-phase procurement process, the second phase being the bid and award of as-needed individual projects and issuance of a Notice to Proceed (NTP) on those projects. Firms pre-qualified under this RFQ will be awarded a pre-qualified contract for a three (3) year term. The pre-qualified contract for as-needed services will have an annual cap not to exceed three million dollars ($3,000,000). All pre-qualified contractors awarded a contract will compete for projects issued by RAP on an as-needed basis. In order to continue to provide services and to maintain facilities and amenities at a high level of safety and in compliance with applicable laws and regulations, RAP will require the services of firms providing as-needed fence and wall installation, maintenance and/or repairs. In awarding these as-needed contracts RAP guarantees no minimum compensation. RAP will evaluate the SOQ each firm submits based on the criteria identified herein. RAP will then recommend those respondents deemed both responsive and qualified to the Board of Recreation and Park Commissioners (Board) for a contract award.

10 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.