Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 10, 2023

September 11, 2023

No Information to Display

617 Jacobs Loop Rd

Demolition, New Construction, Site Work

No Information to Display

No Information to Display

Public - State/Provincial

img_map_placeholder

617 Jacobs Loop Rd, Bolton, NC

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

The Contractor shall furnish a new MHU and all necessary labor, materials, supervision, machinery, tools, apparatus, transportation, equipment and such other services necessary to complete the Project's Scope of Work. A good and workmanlike manner and in accordance with all applicable laws, regulations, and ordinances including, without limitation, all applicable North Carolina, local and federal building, housing, zoning, energy efficiency, environmental, safety, and sanitary codes, standards and/or quality. OSBM-DR will approve Alternate Prices through change order. It is a condition of this Contract that the work shall be subject to inspection by the AHJ, which will approve the MHU Construction Documents for the building permit as well as inspect the construction for occupancy and building code compliance. Notwithstanding the foregoing, Contractor must obtain OSBM-DR written approval of any change in the Contract's scope of work prior to performing the change in work. Contractor may only proceed with a change in work if failure to do so will create a life-safety risk to the workers or Owner if not made at time the change was discovered. OSBM-DR will pay for approved change orders. The primary goal of the DRA program is to expedite the State's housing recovery efforts to counties that have needs that are not met by any federal disaster recovery programs. The DRA dispute resolution program will achieve the foregoing goal by fairly and timely addressing: changes in work; delays and requests for time extensions; DRA compliance issues; performance issues of Contractor and/or subcontractors; non-conforming or deficient work issues (quality control/quality assurance); payment and nonpayment issues; warranty issues within the first year (to the extent OSBM-DR is still implementing a DRA Housing Recovery Program); OSBM-DR's enforcement of contract requirements; action on or disposition of any audit finding; OSBM-DR complaints relating and/or arising out of the construction of the Project; and/or any other dispute or claim that arises from or relates to the Project

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.