Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 10, 2023

September 11, 2023

No Information to Display

66 Glass St

Demolition, New Construction, Site Work

No Information to Display

No Information to Display

Public - State/Provincial

img_map_placeholder

66 Glass St, Clarkton, NC

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

Written inquiries regarding the IFB may be emailed to OSBMDR (John Donachie, Operations Manager) atjohn.donachie@osbm.nc.gov up until 5:00 pm on August 4, 2023. After the opening of bids, no bid may be withdrawn, except under the provisions of General Statute Subject to the process set forth in Section 143-129.1 of the North Carolina General Statutes, a bidder's pricing shall remain valid for a period of forty-five (45) days unless otherwise specified in bid or an addendum to the IFB. Should the successful bidder default and fail to execute a contract, the contract may be awarded to the next lowest and responsible bidder, and OSBM-DR reserves the right to seek compensation from the original successful low bidder to cover any increased costs between the two bids. OSBM-DR and Contractor will attend a meeting at the Project sites within 10 business days of the contract award(s). The homeowner may attend the meeting. The meeting will go over the scopes of work and set the start date(s) of the Project(s) that will be included in the notice to proceed that will be issued following the meeting. OSBM-DR will verify that Contractor has all required insurance in place prior to the start of demolition. The Contractor shall furnish a new MHU and all necessary labor, materials, supervision, machinery, tools, apparatus, transportation, equipment and such other services necessary to complete the Project's Scope of Work.

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.