Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 30, 2023

October 30, 2023

November 23, 2024

NW 41st Ave

Paving, Site Work

No Information to Display

No Information to Display

Public - City

img_map_placeholder

NW 41st Ave, Miami Gardens, FL

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

Vista Verde Phase 4 Drainage Improvements To reduce flooding and repair the damaged roads in the Vista Verde neighborhood Phase 4, the roadway surfaces in these areas and the drainage are being improved. Phase 4 is the section from NW 41st Avenue Road north through NW 207 Lane and continue north on NW 41st Avenue Road to the end of NW 41st Avenue Road. The existing drainage is insufficient to capture the runoff from the adjacent streets, which includes the adjacent streets (access roads to the properties-details in the construction plans). To reduce future flooding events, the Contractor will install additional drain field, catch basins, drain pipe and inter-connect the existing drainage piping. Question Deadline:08/16/2023 at 5:00 PM ET A 5% Bid Bond is a requirement of this Invitation to Bid. Bond Requirements: 100% Performance and Payment Bond is a requirement of this project. The City encourages Certified Minority Business Enterprises and Section 3 Businesses to submit proposals. The City also strongly encourages Bidder(s) to hire employees residing within City of Miami Gardens that are Section 3 residents. This is a HUD Funded Federal Program, all Bidders must agree to comply with the Prevailing Wage Rate / Federal Davis-Bacon Act Provision , whichever is higher if applicable. It is requested that the bidder(s) quote fixed prices that will be guaranteed to the City of Miami Gardens throughout the term of the contract. Substantial completion shall be 360 calendar days after the Notice to Proceed and final completion of 390 calendar days after the Notice to Proceed. These liquidated damages of Five Hundred Dollars ($500.00) per day will be deducted from the contract sum for each calendar day elapsing beyond 360 calendar days after the Notice to Proceed. The City of Miami Gardens reserves the right to waive irregularities and to reject any and all Solicitations.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.