Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 30, 2023

September 29, 2023

No Information to Display

Multiple Locations

Site Work

No Information to Display

$500,000.00

Public - City

img_map_placeholder

Multiple Locations, Quincy, CA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Documents are for viewing purposes only, in order to be eligible to bid, bidders must receive documents through the owner. The Feather River Canyon Community Services District (FRCCSD) invites qualified Contractors to bid on the removal / replacement of +/- 2,500 feet of 2 inch steel pipe and water intake repair, for Paxton, Hwy 70, 32160 Paxton Road Quincy, CA 95971. Minority and women business enterprises are encouraged to bid. All Federal and State equal opportunity and non-discrimination regulations apply. The Commission reserves the right to reject any and all bids and to waive immaterial defects or deviations in the bids received. Water Main; (Design Build) 1. Remove and dispose of +/- 2,500ft of steel pipe from hillside and cliff and replace with 2 inch schedule 40 steel pipe with appropriate couplers, buried where possible. 2. Bury (minimum 12 inches) and/or protect new steel pipe with weather, sun and freezing protection to 10F. 3. Secure unburied steel pipe to hillside and cliff with earthquake anchors from beginning to end. Maximum distance between anchors of 20 feet. 4. Trim brush and hazardous trees back 20 feet on both sides of pipeline for work site safety and maintenance access. Scatter and leave out of access zone, no more than 12 inches above ground. 5. Remove temporary +/- 2,500 feet of 2 inch plastic pipe. (deliver to district as directed) 6. Place erosion control in work areas. 7. Leave buried sections of pipe in place when possible (for minimal soil disruption) Separate line item - Water Intake; (Design Build) 1. Clean out soot, ash and natural materials from 80x 3 x 3 spring intake screen location. 2. Remove and replace intake screen and gallery and box system.

7 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.