Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 23, 2023

September 22, 2023

November 30, 2023

Multiple Locations

Paving, Site Work

No Information to Display

$97,721.00

Public - City

img_map_placeholder

Multiple Locations, Kirkland Lake, ON

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Paving The Company is required to pave a section of roadway on the east side of the facility with an approximate area of 1,115 sq m. Some removal of existing materials may be required. Grading and Shaping of the surface area with Grading Material may be required as will be determined by the Company Parking The Company is required to include six (6) accessible parking spots with access aisles required as per section 80.32 - 80.39 of Ontario Regulation 191/11 Integrated Accessibility Standards of the Accessibility for Ontarians with Disabilities Act, 2005. The surface of all parking spaces must have a maximum slope of 2% in any direction. Pavement markings must use non-slip paint with the International Symbol of Accessibility to be painted in each parking spot. Question Deadline: 08/18/2023 Town of Kirkland Lake reserves the right to Reject any or all bids submitted in response to this RFQ at its sole discretion. Award is subject to final approval.

5 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.