Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 17, 2023

September 18, 2023

November 17, 2023

4054 Deer Trail

Demolition, Renovation, Site Work

No Information to Display

$424,919.00

Public - County

img_map_placeholder

4054 Deer Trail, Middleburg, FL

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Bids require a five (5%) percent bid bond and may not be withdrawn after the scheduled opening time for a period of thirty (30) days. The term bid bond shall include bonds or cashier or certified checks payable to the County. 90923, 90925, 91240, 97139 shall file a 100% Performance Bond and Payment Bond (using Clay County's Standard Form) in the Public Record of Clay County, Florida, The Board reserves the right and power to reject any and all Bids without cause and to waive technical and non-technical or non-material defects in the Request for Bids or submittal of any Bid, and in its discretion to re-advertise the Request for Bids. The Board reserves the right to award Request for Bids which would be in the Best Interest of the County. Prospective bidders are notified that the failure to include a proper bid bond or other security approved under the county's purchasing policy, if required for this request, will result in rejection of the bid and shall, as well as the failure to file a written notice of protest and to file a written petition initiating a formal protest proceeding within the times and in the manner prescribed in chapter 8, section i of the county's purchasing policy shall, constitute a waiver of the right to protest the bid request, any addendum thereto, or the bid decision, as applicable, and to initiate a formal protest proceeding under the purchasing policy. The county's purchasing policy can be viewed at the county's website by following the appropriate links from the homepage address set forth above. If a prospective bidder is in doubt whether this request requires a bid bond, such prospective bidder is solely responsible for making appropriate inquiry. The board reserves the right to reject any and all bids without cause and to waive technical and non- technical or non-material defects in the request or submittal of any bids. A person or affiliate who has been placed on the convicted vendor list following a conviction for a public entity crime may not submit a bid on a contract to provide any goods or services to a public entity, may not submit a bid on a contract with a public entity for the construction or repair of a public building or public work, may not submit bids on leases of real property to a public entity, may not be awarded or perform work as a contractor, supplier, subcontractor, or consultant under a contract with any public entity, and may not transact business with any public entity in excess of the threshold amount provided in section 287.017, florida statutes, for category two for a period of 36 months from the date of being placed on the convicted vendor list. Workdays and hours - normal work hours of monday through friday, 7:30 a.M. To 5:00 p.M. Unless approved by project manager. Project consists of demolition of existing house located at 4054 Deer Trail, Middleburg, Florida 32068 to be replaced with a new two bedroom, one bath mobile home, approximately 900 - 1,000 sq. ft. conditioned space per all code requirements and shall include at a minimum a refrigerator and stove. Bidders are required to visit site prior to bid submittal. Contractor Requirements: All work accomplished must comply with all applicable codes and ordinances of the current Florida Building Code, Clay County Board of County Commissioners and the appropriate municipality, if applicable. Work shall be completed within Sixty (60) days from Notice To Proceed.

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.