Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 19, 2023

November 6, 2023

October 31, 2024

To Be Determined

Site Work

No Information to Display

$1,258,000.00

Public - County

img_map_placeholder

To Be Determined, Easton, MD

Subscribe to View Full Documents

PROJECT includes the installation of a 3-inch through 8-inch HDPE forcemain for a length of 18.8 miles from the Region II (St. Michaels) Wastewater Treatment Plant, to the Mount Pleasant area, under Broad Creek, and to the Villages of Bozman and Neavitt, as outlined in Resolution No. 250; and the installation of service stubs, whereby individual lot connections can be made at a later date as a part of Phase 2 of the Resolution 250 septic system elimination project. The project also includes the installation of lot valves, pressure sewer cleanout assemblies, air vacuum relief valves, sewer system testing, final seeding and stabilization for disturbed areas, final site cleanup The contract for this project shall be awarded to the firm submitting the lowest, responsible, and responsive lump sum Base Bid. THE COUNTY COUNCIL OF TALBOT COUNTY reserves the right to reject any or all bids or to accept any bid Question Deadline 08/23/2023 at 12:00 PM ET Contractorshall complete all Work asspecified or indicated in the Contract Documents. The Work is generally described as follows: Installation of small diameter sanitary forcemains using directional drilling technique, from the Village of Neavitt, through Bozman, terminating at Saint Michaels, MD, as provided in the Contract Documents. ARTICLE 2--THE PROJECT 2.01 The Project, of which the Work under the Contract Documents is a part, is generally described as follows: Installation of small diameter sanitary forcemains using directional drilling technique, from the Village of Neavitt, through Bozman, terminating at Saint Michaels, MD, as provided in the Contract Documents.

13 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.