Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 31, 2023

April 20, 2024

December 17, 2023

4403 McLean Dr

Renovation

No Information to Display

$2,662,478.00

Public - State/Provincial

img_map_placeholder

4403 McLean Dr, Rogersville, AL

Subscribe to View Full Documents

**As of October 20,2023, bids were cancelled. No definite date for the rebid.** Joe Wheeler State Park Campground Loop A Renovations. A cashiers check or bid bond payable to Alabama Department of Conservation and Natural Resources State Parks Division in an amount not less than five (5) percent of the amount of the bid, but in no event more than $10,000, must accompany the bidders proposal. Performance and Payment Bonds and evidence of insurance required in the bid documents will be required at the signing of the Contract. All bidders bidding in amounts exceeding that established by the State Licensing Board for General Contractors must be licensed under the provisions of Title 34, Chapter 8, Code of Alabama, 1975, and must show evidence of license before bidding or bid will not be received or considered by the Engineer (Architect); the bidder shall show such evidence by clearly displaying his or her current license number on the outside of the sealed envelope in which the proposal is delivered. The Owner reserves the right to reject any or all proposals and to waive technical errors if, in the Owner's judgement, the best interests of the Owner will thereby be promoted. Alabama Department of Conservation and Natural Resources State Parks Division (Awarding Authority) Barge Design Solutions, Inc. (Engineer The Work of Project is defined by the Contract Documents and consists of the following: 1. Construction of improvements to the Joe Wheeler Campground Loop A consisting of upgraded pads at each campsite, replacement of electrical services including bollard and pole lighting, replacement of water and sewer laterals and connections, replacement of sewer lift stations and control panels, rehabilitationof sewer collection lines and manholes. Parking areas and other work indicated in the Contract Documents are included

9 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.