Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 31, 2023

August 30, 2023

October 29, 2023

2955 State Hwy 44

Site Work

No Information to Display

No Information to Display

Public - State/Provincial

img_map_placeholder

2955 State Hwy 44, Marianna, AR

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

The work of the Project includes the removal of asphalt paving that has broken up in the Day Use Parking Lot. A fill material is required to fill in the hole. Flow over fill will be installed with Rip Rap applied over the flow over fill. Re-use any existing Rip Rap if possible. A concrete sidewalk shall be installed. An asphalt paving system will need to be installed in the parking lot in the damaged area. The Department requests completion of project within sixty (60) calendar days after receipt and acknowledgment of purchase order. A. Contractor shall furnish all tools, material, equipment and labor necessary to complete project. B. Contractor shall construct any and all construction safety barriers to keep bystanders out of work areas and at a safe distance for the duration of the project. C. Contractor shall prevent unnecessary damage to any part of the natural area. D. Contractor shall be responsible for any and all post-project clean-up. E. Contractor shall remove all debris (including nails and metals), and all disposable materials offsite at the end of each workday. F. Contractor shall work during normal business hours, excluding State Holidays. G. Contractor shall schedule all work with Park Superintendent or her designee. H. Contractor shall be responsible for all material deliveries during construction. I. Contractor shall provide a one (1) year warranty that applies to all work performed. J. Final inspection will be conducted and approved by Greg Hart from Arkansas State Parks. Submit any questions requesting clarification of information contained in this Bid Solicitation in writing to adpht.procurement@arkansas.gov by noon, Central Time on or before July 25, 2023.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects