Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 21, 2023

September 6, 2023

November 30, 2024

215 21st St E

Paving, Site Work

No Information to Display

$1,966,533.00

Public - County

img_map_placeholder

215 21st St E, Hastings, MN

Subscribe to View Full Documents

Site Directions: Located in the City of Hastings generally paralleling the Vermillion River from 31st St SW to Vermillion River Trail Bridge, and from 18th St W (CR 291) through C.P. Adams Park to Ravenna Trail, and at the intersection of Progress Drive and Ravenna Trail, and from 10th St E west of Progress Drive to the west side of the Canadian Pacific Railway and 8th St E, and at Tyler St at Levee Park. Direct questions about this Project, including pre-bid questions, to Blake Hansen at 952.912.2637 and bhansen@sehinc.com. COUNTY TRANSPORTATION NO. 98-031 PARKS NO. P30002 Paving (Trail Paving), Pedestrian Improvements, Lighting Landscape / Outdoor, Aggregate, Concrete Walkway, Street/Road Asphalt Milling, Grade, Surface and Bridge, Pavement Removal, Signage, Erosion Control - Temporary TYPE OF WORK Milling, Grading, Bituminous Pavement, and Pedestrian Bridge Construction. The major items of work are approximately: 2104.504 Remove Bituminous Walk SY 10384 2106.507 Excavation - Common (EV) (P) CY 2207 2106.507 Common Embankment (CV) (P) CY 1558 2211.509 Aggregate Base, Class 5 TON 7463 2232.504 Mill Bituminous Surface (1.5") SY 3721 2360.509 Type SP 9.5 Wearing Course Mix (2,C) TON 3784 2402.602 Pedestrian Bridge (Super Structure) LS 1 2521.518 6" Concrete Walk SF 4070 Bids must be accompanied by a corporate surety bond, made in favor of Dakota County in an amount of at least 5% of the amount bid. The right is reserved to accept or reject any or all bids and to waive any informalities therein. Est. Completion Date: Nov. 30, 2024.

40 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects