Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 16, 2023

December 18, 2023

April 26, 2024

3 Overpeck Pk Driveway

Site Work

No Information to Display

$172,215.00

Public - County

img_map_placeholder

3 Overpeck Pk Driveway, Leonia, NJ

Subscribe to View Full Documents

Work shall consist of supplying and installing concrete pavement and Lam Beam Structure footing, and according to the plans, construction details and specifications and at the direction of the County and shall be installed to the Countys satisfaction. The Installation of a Lam Beam Gable Shelter (Supplied by Bergen County Parks Department) With a Concrete Pad (to Be Supplied and Installed by Contractor) at Overpeck Park for Field Station Dinosaurs. Questions Due Date: Sep 29th 2023, 1:00 PM EDT Inquiries regarding this project shall be directed to the Bergen County Website - www.bergenbids.com through the Bonfire Portal All proposed improvements included in this project shall be completed within 30 calendar days after the after notice to proceed, weather permitting. Project has been cancelled Field Station Dinosaurs is a concession within Overpeck Bergen County Park in Leonia, NJ. This project is for the installation of a Lam Beam Cable Shelter Structure, 40' x 60', provided by the Bergen County Parks Department, and a new concrete pad beneath the Shelter Structure. The area shall serve as a performance area for Field Station Dinosaurs. Installation shall include all tools, labor, and materials necessary to complete these tasks. Under this item, the Contractor shall supply all labor, materials and equipment to prepare the site for the new construction. Existing rubber tiles on bare ground shall be removed and neatly stacked for reinstallation by the Contractor on the new concrete pad, once construction of the new Shade Pavilion is complete. Contractorshall provide up to 100 lf of erosion control.

6 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects