Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
August 23, 2023
September 10, 2023
September 9, 2024
101 Bulldog Ln
Paving, Site Work
No Information to Display
$600,000.00
Public - County
101 Bulldog Ln, Hazard, KY
The proposed project (approximately 2.1 acres, the waste area is approximately 18.0 acres, though only a small fraction will be used) consists primarily of installing a pile and lagging retaining wall to stabilize the hillside below the Cornett residence. The project area is located at N 37 02' 46.38", W 83 08' 45.79". The site address is 212 Clover Fork Road and is located off KY-699 in Leatherwood, KY 41731. The primary waste area is located approximately 2.2 miles from the project site at N 37 02' 22.3", W 83 10' 29.3". Reclamation work consists of constructing a pile and lagging retaining wall in the northwest hillside below the Cornett residence. The steel piles will be W14x68 and conform to the "Steel" AML Technical Specification. Concrete Formed and finished is included to construct a foundation of the concrete lagging panels. Concrete Non-Formed and Finished is included to seat steel piles. Soil and Rock drilling (36") is included to set steel piles. Filter Fabric is included to secure the retaining wall once installed, and No. 2 Stone and Class II backfill are included to stabilize the hillside and allow for drainage behind the wall. Retaining Wall Subdrain also is included to deal with drainage behind the wall. A row of rail steel with guardrail lagging will be installed on the northwest side of the residence to maintain hillside integrity during construction of the pile and lagging wall, and another row of rail steel and lagging will be installed downhill from the wall. This is done to create a stable bench from which the drill rig can operate for the construction of the wall. More Concrete Non-Formed and Finished is included to seat the rail steel, and Soil and Rock Drilling (15") is included to set rail steel. Any material relocated due to these construction efforts will be paid for under the "Earthwork" bid item. Some trees near the state road KY-699 may need to be removed to allow equipment to access the project site, and if deemed necessary by the ENGINEER, this will be paid for by the "Site Preparation" bid item. Hay bales/silt fence will be used for sediment and erosion control. Bridge cribbing is included for the existing bridge into Clover Fork Road. Site Preparation is included to allow for any preparation of land which will be disturbed by the project. Hoe Ram is included in case it is needed to create the bench where the retaining wall will be constructed. Bituminous Repair is included to repair "in kind" any existing Bituminous damaged by normal construction activities to Clover Fork Road. Dense Grade Aggregate and Roadway Stone are also included to repair damage done to Clover Fork Road. Driving directions: From the Hazard field office, turn right and stay on KY-15 S for 4.9 miles, then turn right onto KY-7 N. After 11.0 miles, turn right onto State Highway 699. After 9.1 miles, turn left onto Clover Fork Road. Travel approximately 0.2 miles, staying to the right, and the Cornett residence will be at the end of the road. To reach the waste area, return to State Highway 699 and turn left. In approximately 2.0 miles the waste area will be on your right. All disturbed area will be revegetated using the bid items as setup in the contract. No trees 3-inch in breast height will be disturbed the period of March through October, except for the slide and transition area.
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Hazard, KY
Bid Date: Aug 24 2023
Hazard, KY
Bid Date: Aug 24 2023
Hazard, KY
Bid Date: Sep 19 2023
Hazard, KY
Bid Date: Nov 02 2023
Hazard, KY
Bid Date: Nov 01 2023
Hazard, KY
Bid Date: Nov 01 2023
Hazard, KY
Bid Date: Oct 03 2023
Hazard, KY
Bid Date: Oct 31 2023
Hazard, KY
Bid Date: Jul 20 2023
Hazard, KY
Bid Date: Aug 24 2023
Elizabethtown, KY
Bid Date: Aug 17 2023
Lexington, KY
Bid Date: Jul 31 2023
Bowling Green, KY
Bid Date: May 18 2023
Louisville, KY
Bid Date: Jul 31 2023
Williamstown, KY
Bid Date: Sep 12 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
