Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 23, 2023

September 22, 2023

November 6, 2023

124 Camp 4 Rd

Paving, Site Work

No Information to Display

No Information to Display

Public - State/Provincial

img_map_placeholder

124 Camp 4 Rd, Swanton, MD

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Concrete installation and repair services Invitation for Bids (IFB) for a contractor to install concrete sidewalks and additions to current sidewalks at various locations at the Department of Juvenile Services, Backbone Mountain Youth Center. Small Business Reserve Designation : Yes MBE Participation Goal: 0% VSBE Participation Goal 0% If you have any questions pertaining to this project, please submit them in writing to the Robert P. Gay, Procurement Officer as soon as possible via email at Robert.gay@maryland.gov. A. This project consists of the Contractor providing all labor, equipment, materials, supplies, insurance, licenses and permits, etc. necessary to install concrete sidewalks and additions to current sidewalks at various locations at Backbone Mountain Youth Center. B. Work associated with the above listed project description includes but is not limited to the following: 1. The Contractor shall excavate and grade areas and fill with compacted material 4" thick. Frame and pour concrete 4" thick with 3,500 psi concrete with wire mesh reinforcement. Broom finish, expansion joints every 6'. Sidewalks to be flush with ground, backed up on edges with dirt then seed and mulch applied. All material used for forms to be removed and disposed of offsite once job is complete. 2. The Contractor shall supply all materials, supplies, and labor to have installation done properly. 3. All work will need done to Garrett County Code C. Areas to be Extended; 1. Front of School; 52ft Long x 3ft. Wide 2. Nurse Sidewalk 10ft Long X 2 ft. Wide 3. Basketball court 12ft Long X 3 ft. Wide D. Areas for New Concrete: 1. 2 sidewalks at Generator Building, both 6 Ft. wide, 1 is 29 ft. long, other is 23 feet. 2. Back of Administration Building. 17ft long X 7 ft. wide 3. Dorm Pathway 48 ft. long X 6 wide 4. Kitchen Furnace Room 32 ft. long X 6 ft. wide 5. New Incentive Building: 2 sidewalks, The Front sidewalk is 83 feet long X 6 ft. wide, The Back sidewalk is 40 Feet long X 6 ft. wide E. Areas that needs old sidewalks removed and replaced with new sidewalk 1. GYM needs a 10 ft. X 10 ft. poured by the door, then 50ft. Long X 6 ft. Wide sidewalk 2. Case Managers 42 ft. Long X 4 ft. Wide. 3. Dorm Furnace 38 ft. Long X 5 ft. Wide 4. Back of Dayrooms 18 ft. Long X 12 ft. Wide

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.