Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 15, 2023

September 14, 2023

March 12, 2024

Multiple Locations

Site Work

No Information to Display

$518,469.00

Public - State/Provincial

img_map_placeholder

Multiple Locations, Texas City, TX

Subscribe to View Full Documents

The deadline to ask questions is 8/10/2023 9:00:00 AM CST 1. Base Bid Unit Price Item #1: Mobilization. It includes construction of temporary facilities and costs for bonds and insurance. 2. Base Bid Unit Price Item #2: Briscoe Pump Station Electrical Service Improvements: All work associated with the Briscoe Pump Station Electrical Improvements shall be provided completely in place and operational as shown and / or specified but not limited to demolition of the overhead power lines and related power pole, including all associated electrical and miscellaneous work. Installation of new 60A/2P (NEMA 4X) to feed the existing 60A disconnect within pump building. f. Removal and replacement of overhead fiber optic cable and supporting pole with underground conduit and cable. Spice fiber optic cable at the service poles and reinstall new fiber optic cable. g. Removal of existing power poles per construction drawings. 3. Supplemental Bid Unit Price Item #1: Demobilization/Remobilization: All work associated with the demobilizing construction labor, equipment and materials and remobilizing at a later date to startup new electrical facilities. The Briscoe Pump Station cannot be shut down during peak seasonal usage and the shutdowns required to transfer service to the new electrical gear must occur during seasonal shutdowns Engineer's Estimate $285,000 to $385,000 USD. 08.8254.01.22.5440 Direct questions regarding distribution of Contract Documents for this Project to Civitas Engineering Group, Inc. Direct questions related to the design of the Project to: Keith A O'Connor, PE (713) 972-6642 koconnor@civitasengr.com

28 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.