Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
August 1, 2023
August 31, 2023
February 27, 2024
To Be Determined
Renovation
No Information to Display
No Information to Display
Public - County
To Be Determined, Wartburg, TN
The following items generally and briefly describe the scope of work included under this contract. The detailed sections of these specifications and the drawings should be relied upon for particular requirements. Part A- CDBG Eligible Work Shall Include: 1. Remove pumps, guiderails, floats, and all appurtenances in existing wet well 2. Abandon in place the existing pump station 3. Install a new factory built above ground pump station as shown on the plans and specifications, complete in place 4. Remove manhole riser sections of upstream screening manhole and replace with new as shown on the plans and specifications 5. Remove existing screen and replace with new 6. Bypass pumping as required Part B- CDBG Non-Eligible Work Shall Include: 1. Install new manual bar screen vault as shown on the plans and specifications, complete in place 2. Piping modifications 3. Install new plug valve and hinged locking cover to existing manhole 4. Bypass pumping as required The Information for Bidders, Form of Bid, Form of Contract, Plans, Specifications, and Forms of Bid Bond, Performance and Payment Bond, and other contract documents may be examined at the following: Plateau Utility District, 407 Eliza Street , Wartburg, TN 37887 The owner reserves the right to waive any informalities or to reject any or all bids. Each bidder must deposit with his bid, security in the amount, form and subject to the conditions provided in the Information for Bidders. All bidders must be licensed General Contractors as required by the Contractors Licensing Act of 1994 of the General Assembly of the State of Tennessee, and qualified for the type of construction being bid upon. Attention of bidders is particularly called to the requirements as to conditions of employment to be observed and minimum wage rates to be paid under the contract, Section 3, Segregated Facility, Section 109 and E.O. 11246. No bidder may withdraw his bid within 60 days after the actual date of the opening thereof.
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Wartburg, TN
Bid Date: Aug 07 2024
Nashville, TN
Bid Date: Aug 01 2023
Nashville, TN
Bid Date: Aug 01 2023
Collierville, TN
Bid Date: Aug 09 2023
Knoxville, TN
Bid Date: Aug 21 2023
Blountville, TN
Bid Date: Jul 26 2023
Memphis, TN
Bid Date: Aug 23 2023
Spring Hill, TN
Bid Date: Dec 08 2022
Murfreesboro, TN
Bid Date: Aug 10 2023
Memphis, TN
Bid Date: Aug 07 2023
Bristol, TN
Bid Date: Jul 18 2023
Knoxville, TN
Bid Date: Aug 29 2023
Hornbeak, TN
--
Newport, TN
Bid Date: Aug 24 2023
Nashville, TN
Bid Date: Aug 29 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
