Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 2, 2023

September 1, 2023

No Information to Display

N Main St

Paving, Site Work

No Information to Display

No Information to Display

Public - City

img_map_placeholder

N Main St, Cottleville, MO

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Concrete Diamond Grinding The City of O'Fallon reserves the right to reject any and all bids and waive any irregularities. The City of O'Fallon also reserves the right to select the lowest and/or best bidder as determined by the City in its sole discretion. Question Deadline Jul 26, 2023 at 12:00 PM PROJECT DESCRIPTION: CONCRETE DIAMOND GRINDING: This work shall consist of all labor, materials, equipment, clean up and disposal required to grind concrete pavement traffic lane surfaces. The contractor will coordinate work with City of O'Fallon Staff. In general, the contractor shall texture the entire pavement surface. Extra depth grinding to eliminate minor depressions in order to provide texturing on 100 percent of the pavement surface will not be required. The grinding contractor shall be responsible to grind the entire width of the road within twenty-four (24") inches of the existing curb. Areas near drainage inlets may require extra grinding to allow all surface water to drain into the existing throat. Any standing water as a result of grinding shall be unacceptable and corrective actions will be required to ensure proper drainage. Proper disposal of all spoil materials, water and diamond grinding slurry shall be the responsibility of the contractor. The City will provide a location to dump the spoils/slurry. HYDRANT PERMIT: The contractor may use City of O'Fallon water to supply the diamond grinding operation. The City of O'Fallon Water Department will require a permit to obtain water from a local hydrant. Said permit may be obtained by contacting the City of O'Fallon Water Department. (City Staff can assist if needed) WORK AREA: The work area will take place on North Main Street in O'Fallon beginning at Tom Ginnever Blvd. and going North approximately 2,000 feet to near Ashford Place Dr. All work will be completed in the far-right lane only. O'FALLON FIRE STATION #1: The O'Fallon Fire Station entrance/exit is included in the work area. Before any work begins in front of or near the Fire Station the Contractor and City Staff will communicate with representatives from the Fire Station to ensure that Fire Trucks and equipment maintain access to North Main or have an alternate entrance/exit. TRAFFIC CONTROL: The City will provide all traffic control for the project. Including Channelizers, Message Boards, Advanced Waring Signs, Arrow Boards, etc

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects