Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 9, 2023

September 8, 2023

September 7, 2024

Multiple Locations

Service, Maintenance and Supply

No Information to Display

No Information to Display

Public - City

img_map_placeholder

Multiple Locations, Okanogan, WA

Our team is requesting plans for this project.

Subscribe to View Full Documents

The Work includes furnishing, delivering, and unloading two trailer-mounted auxiliary generators, startup and training services, and all other services as required to provide a complete and workable system. The Supplier shall provide all labor, supervision, materials, tools, equipment, transportation, supplies, and other things required expressly by, or reasonably implied from, the Contract, to complete all Work. Omissions from the Contract of details of Work which are necessary to carry out the intent of the Contract, or which are customarily performed, shall not relieve the Supplier from performing the complete Work called for by the Contract; such Work shall be performed as if fully set forth and described in the Contract. All Proposals must be accompanied by a certified check, postal money order, cashiers check, or Proposal bond payable to the "City of Okanogan" and in an amount of not less than five percent (5%) of the total Proposal amount. The Proposal Deposit will be held as a guaranty that the successful Bidder will, within 10 working days from the date of notification of Award, enter into a Contract and furnish approved Performance and Public Works Payment Bonds, on forms attached, in amounts equal to 100 percent of the amount of the Contract, including state sales tax. The equipment shall be delivered within 365 calendar days after the commencement date stated in the Notice to Proceed. The Supplier, any Subcontractor, and all individuals or firms required by RCW 39.12, WAC 296-127, or the Federal Davis-Bacon and Related Acts (DBRA) to pay minimum prevailing wages, shall not pay any worker less than the minimum hourly wage rates and fringe benefits required by RCW 39.12 or the DBRA. Higher wages and benefits may be paid. The City of Okanogan expressly reserves the right to reject any or all Proposals and to waive minor irregularities or informalities and to Award the Project to the lowest responsive, responsible bidder as it best serves the interests of the City. The undersigned agrees that the Owner reserves the right to Award the Contract to the lowest responsible, responsive bidder whose Proposal is in the best interest of the Owner.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects