Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 3, 2023

September 4, 2023

November 15, 2023

Arthur Rd

Paving, Site Work

No Information to Display

No Information to Display

Public - City

img_map_placeholder

Arthur Rd, Slinger, WI

Subscribe to View Full Documents

Approximate quantities are as follows: Clearing and Grubbing 5,800 SY \ Removing Asphaltic Surface 1,700 SY \ Excavation Common 3,500 CY \ Base Aggregate Dense 1 1/4-Inch 1,940 TON \ HMA Pavement 3 LT 58-28 S (2.5'' Binder) 300 TON \ HMA Pavement 4 LT 58-28 S (2.5'' Surface) 300 TON \ Asphaltic Surface (4" Path) 90 TON \ Curb & Gutter 30-Inch Type D 650 LF \ Concrete Sidewalk 5-Inch 230 SF \ Curb Ramp Detectable Warning Field Radial Natural Patina 41 SF \ Apron Endwalls for Culvert Pipe Reinforced Concrete 12-Inch 1 EACH \ Storm Sewer Pipe Reinforced Concrete Class V 12-Inch 16 LF \ Catch Basins 4-FT Diameter 1 EACH \ Silt Fence 315 LF \ Traffic Control 1 LS \ Temporary Mailbox 1 EACH \ This is a unit price contract. The estimated quantities as indicated above and on the Bid Schedule are inserted only for the purpose of determining the low bidder. \ The Contract letting shall be subject to the provisions of Sections 61.54, 62.15, 66.0901, and 66.0903 of the Wisconsin Statutes. \ Bids shall be accompanied by Bid Security in the form of a Bid Bond, certified check, or cashier's check made payable to the Owner in an amount of five (5) percent of the Bidder's maximum Bid price. If the successful bidder fails to execute the contract and furnish the required bonds within 15 days after the Award, the Bid Security shall be forfeited to Owner as liquidated damages. No bid may be withdrawn for a period of 45 days from the date of the bid opening. \ The Owner has the right to reject any and/or all bids received, to waive any minor defects or irregularities that may be found in the bids, and to accept the bid that is in the best interest of the Owner. \ Bidder awarded a contract for the work shall be required to furnish a Performance Bond and a Payment Bond in the full amount of the contract price.

15 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.